Available 24/7 at
+86 13632816717onsemi NCV7240DPR2G
- Part No.:
- NCV7240DPR2G
- Manufacturer:
- onsemi
- Package:
- 24-SSOP (0.154", 3.90mm Width)
- Datasheet:
- Description:
- IC POWER DRIVER 8-CH 24SSOP
- Quantity:
Unit Price:$0
Ext Price:$0
- Payment:

- Shipping:

Inventory:0
Send us your inquiry,we will respond immediately.
NCV7240DPR2G Specifications
- Specifications
- The Posts
- Related
- Attributes
- Property Value
- Manufacturer
- onsemi
- Package/Case:
- 24-SSOP (0.154", 3.90mm Width)
- Series:
- -
- Packaging:
- Tape & Reel (TR)
- Product Status:
- Obsolete
- Switch Type:
- General Purpose
- Number of Outputs:
- 8
- Ratio - Input:Output:
- 1:8
- Output Configuration:
- Low Side
- Output Type:
- N-Channel
- Interface:
- SPI
- Voltage - Load:
- 3.3V, 5V
- Voltage - Supply (Vcc/Vdd):
- Not Required
- Current - Output (Max):
- 600mA
- Rds On (Typ):
- 1.5Ohm
- Input Type:
- -
- Features:
- -
- Fault Protection:
- Open Load Detect, Over Temperature
- Operating Temperature:
- -40°C ~ 150°C (TJ)
- Grade:
- Automotive
- Qualification:
- AEC-Q100
- Mounting Type:
- Surface Mount
- Supplier Device Package:
- 24-SSOP
- Voltage Regulators - Linear, Low Drop Out (LDO) Regulators(66836)
- Voltage Regulators - Linear Regulator Controllers(325)
- Voltage Regulators - Linear + Switching(1473)
- Voltage Regulators - DC DC Switching Regulators(35780)
- Voltage Reference(8428)
- V/F and F/V Converters(139)
- Thermal Management(515)
- Supervisors(41287)
- Special Purpose Regulators(4820)
- RMS to DC Converters(144)
- Power Supply Controllers, Monitors(2134)
- Power Over Ethernet (PoE) Controllers(796)
- Power Management - Specialized(6809)
- Power Distribution Switches, Load Drivers(7254)
- PFC (Power Factor Correction)(1047)
- OR Controllers, Ideal Diodes(604)
- Motor Drivers, Controllers(4748)
- Lighting, Ballast Controllers(443)
- LED Drivers(6996)
- Laser Drivers(454)
NCV7240DPR2G FAQ
1. How to order NCV7240DPR2G on EASTECH ELECTRONICS LIMITED.?
Currently, EASTECH ELECTRONICS LIMITED. only provide peer-to-peer order processing. While you submit the RFQ, our professional agent will contact you with the competitive prices in the global market, and our agent will prompt you to finish the order if you accept our offers.
2. How does EASTECH ELECTRONICS LIMITED. guarantee that NCV7240DPR2G is from the original manufacturer or authorized agents?
We have a professional and experienced quality control team to strictly verify and test the NCV7240DPR2G. All suppliers must pass our qualification reviews before they can publish their products including NCV7240DPR2G on EASTECH ELECTRONICS LIMITED.; we pay more attention to the channels and quality of NCV7240DPR2G products than any other customer. We strictly implement supplier audits, so you can purchase with confidence.
3. Are the NCV7240DPR2G price and inventory displayed accurate?
The price and inventory of NCV7240DPR2G fluctuates frequently and cannot be updated in time, it will be updated periodically within 24 hours. And, our quotation usually expires after 5 days.
4. What forms of payment are accepted?
Wire Transfer, PayPal, Alipay, Wechat, Credit Card, Western Union, MoneyGram, and Escrow are all acceptable.
Warm Tips: Some orders in certain payment forms may require handling fee.
5. How is the shipping arranged?
Customers can choose industry-leading freight companies, including DHL, UPS, FedEx, TNT, and Registered Mail. Shipping insurance is also available.
Once your order has been processed for shipment, our salesperson will send you an email advising you of the shipping status and tracking number.
Warm Tips: It may take up to 24 hours for the carriers to display tracking information. Usually, express delivery takes 3-5 days, and registered mail takes 25-60 days.
6. What is the process for return or replacement of NCV7240DPR2G?
All goods will implement Pre-Shipment Inspection (PSI), selected at random from all batches of your order to do a systematic inspection before arranging the shipment. If there is something wrong with the NCV7240DPR2G we delivered, we will accept the replacement or return of the NCV7240DPR2G only when all of the below conditions are fulfilled:
(1)Such as a deficiency in quantity, delivery of wrong items, and apparent external defects (breakage and rust, etc.), and we acknowledge such problems.
(2)We are informed of the defect described above within 90 days after the delivery of NCV7240DPR2G.
(3)The PartNo is unused and only in the original unpacked packaging.
Two processes to return the products:
(1)Inform us within 90 days
(2)Obtain Requesting Return Authorizations
7.How to contact us to get technical supports, such as NCV7240DPR2G pin diagram, NCV7240DPR2G datasheet?
If you need any after-sales service, please do not hesitate to contact us.


